歇山顶组合殿座正殿加抱厦琉璃屋面施工工艺剖析
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Analysis of the Construction Technology of Adding Glass Roof to the Main Hall of the Xieshop Combination Hall
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    介绍歇山顶组合殿座古建琉璃屋面施工重点部位,主要包括尖山、圆山正脊对博缝板的标高要求,连接正殿、抱厦二者屋面的的天沟和窝角沟,以及其金刚墙标高、囊向的详细实施过程。重点内容包括:歇山屋面分中控制线,屋面瓦瓦样活过程,琉璃屋脊的详细要求;各种屋脊之间、脊与瓦面之间,它们既独立又关联的关系。通过真实的图片、简单的叙述,予以展现、说明。

    Abstract:

    Introduce the key parts of the construction of the ancient building's glazed roof for the Xieshan Mountain Combination Hall, mainly including the elevation requirements of the ridge of the Jianshan and Yuanshan to the Bo joint board, the gutter and Wojiao gutter connecting the roofs of the main hall and the Baoxia, as well as the detailed implementation process of its diamond wall elevation and envelope direction. The key content includes: the control line for the separation of the Xieshan roof, the process of roof tile sampling, and detailed requirements for the glazed roof ridge; The relationships between various ridges and between ridges and tile surfaces are both independent and interrelated. Present and explain through real pictures and simple narratives

    参考文献
    相似文献
    引证文献
引用本文

盖玉东 .歇山顶组合殿座正殿加抱厦琉璃屋面施工工艺剖析[J].古建园林,2024,(172):1-7转13

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2024-07-01
  • 出版日期: