Abstract:Chongling project is the last imperial project in the Qing Dynasty, after six years of construction completed in 1915. As the imperial tomb, is the highest level of the project. The time of social unrest coupled with complex geological conditions, the project is extremely difficult. The quality and efficiency of the project can be guaranteed by the proper and timely use of the new technology introduced into China at the end of the Qing Dynasty. It can be seen that the introduction of technology at the end of the Qing Dynasty has an optimized effect on the traditional construction and management.