Abstract:In the abutment and wall maintenance project, scaffolding should meet the following requirements: make sure the characteristics of the wall and abutment, and the use of scaffolding during maintenance operation, and then determine the method of binding. There are two main reasons and conditions for the damage of the wall and abutment: the first one is the top water leakage and immersion in the wall, after freezing, the surface brick layer peeling empty drum; Another kind of circumstance is metope suffers from sun and rain, brick surface is weathered crisp and flakes off. Belong to the first case of maintenance, must tie double row scaffolding. For the maintenance of the second case, the scaffolding can be arranged in a single row according to the decoration requirements. But regardless of the single row or double row of scaffolding, we must consider the angle of wall(Shoufen ). The scaffold that is near the wall cannot stand upright, otherwise the lower part is suitable, the upper part is too far from the wall, can not reach the wall when using. When Spreads board, the end of the plank should not top the wall, otherwise it will affect the maintenance operation. "Zuo che qiang" is according to such characteristics and requirements to determine the scaffold binding method.